A self-imposed deadline is driving the most ambitious element of the Trump administration’s plan to overhaul a beloved stretch of Washington, D.C. public parkland.

Two sources familiar with the proposal told reporters that President Trump wants construction completed before the United States marks its 250th Independence Day, creating significant pressure on a project still riddled with unanswered questions.

The administration submitted a 55-page concept plan to transform East Potomac Golf Links on the Hains Point peninsula into a championship-caliber public course.

Interior Department officials worked alongside golf course architect Tom Fazio to develop the proposal, which Trump described as “a plan to build a World Class Championship Golf Course on the site of the current East Potomac Golf Links.”

The design draws inspiration from celebrated public venues including Torrey Pines, Bethpage Black, and Houston’s Memorial Park, signaling the administration’s ambition for a marquee national facility.

A $304.5 million seawall encircling the Hains Point peninsula is also part of the broader proposal, though that figure represents infrastructure costs separate from the golf course redesign itself.

Despite the scale of the vision, the concept plan leaves fundamental financial and logistical details unresolved, including total project cost, the length of the construction period, and what golfers would ultimately be charged to play.

To make way for the new 18-hole layout, the plan would eliminate the property’s existing par-3 course and executive course, and potentially the site’s historic miniature golf course as well.

Critics have raised sharp objections to those trade-offs, particularly the proposal to remove additional trees and push the new course to the river’s edge, which would erase cycling paths and pedestrian walkways along the Potomac.

The facility could be rebranded as the “Washington National Golf Course,” and renderings of a proposed logo bear a close resemblance to the branding used across the president’s private club portfolio.

The plan is now under review by the National Capital Planning Commission while a separate legal challenge to the project continues to work its way through the courts.

Community advocates and recreational users of the peninsula argue the redesign would privatize the character of what has long functioned as open, multi-use public green space in the nation’s capital.

The administration has yet to clarify how it intends to fund the project or whether congressional appropriations would be required to move beyond the concept stage.